Permit Fees and Developmental Guides
Access Control - Door $100 for Access Control Door
Access Control - Gate $50 for Access Control Gate
After Hours Inspection $75 per hour, per inspector
- Two-hour minimum charge
- After hours: anytime other than Monday–Friday, 8 AM–5 PM
Alternative Fire Suppression System $100 per system
Annual Life Safety Inspections (3rd Reinspection) $150 reinspection fee assessed on each inspection thereafter
Burn Permit - 10 Days $500 - Commercial Land Clearing
Burn Permit - 10 Days $50 - Residential Land Clearing
Day Care Centers $50
Fire Alarm Systems Permit $100 for up to 25 devices
- $2 per device after 25
- $75/hour with a 2-hour minimum for additional inspections or reinspection
- Multi-story buildings: floors 1-4 included. Additional floors above 4 are permitted per floor.
- Multi-building complexes: permitted per building up to 4 floors.
Fire Sprinkler System Permit $125 for up to 100 heads
- $1 per head after 100
- $125 for additional inspections or reinspection
- Multi-story buildings: floors 1-4 included. Additional floors above 4 are permitted per floor.
- Multi-building complexes: permitted per building up to 4 floors.
Fire Sprinkler – Underground Main and Remote FDC $150 per line (remote FDC is classified as a separate line)
Foster Homes $30
Fuel Tank $100 per tank
Fuel Line Testing $100 per set of fuel lines
Health Care Facilities $150
Hospital Inspection $250
Nursing Home Facilities $150